• Home
  • Language
    • हिन्दी
    • English
  • CBRI Mail
  • CBRI Intranet
  • OneCSIR
  • AE-BAS
  • Discussion Forum
  • Gallery
    • Photo Albums
    • Videos
  • SAIF
  • Help
  • Log In
Top Menu
TwitterFacebookYouTube
CSIR - CBRI, RoorkeeCSIR - CBRI, Roorkee
CSIR – CBRI, Roorkee
Central Building Research Institute
  • The Institute
    • About Institute
    • Organogram
    • Director’s Profile
    • Research Council
    • Management Council
    • Our Navigators
    • Performance Indicators
      • Patents
      • Institute Publications
      • Research Publications
      • Technologies Transferred
      • Financial Cash Flow
      • External Cash Flow
      • Memorandum of Understanding
  • R&D
    • R&D Areas & Groups
    • R&D Support Activities
    • R&D Programs
      • CSIR FTT Project
      • Mission Mode Projects
        • Mass Housing Project
        • Heritage Structures
        • Safety & Security of Vital Installations
      • Foreign Collaboration
        • Indo-US Project
        • Indo-UK Project
      • In-House Research
      • Grant-In-Aid Projects
      • Sponsored Research
      • Consultancy Projects
  • AcSIR
    • MTech
    • PhD
  • KRC
    • General Information
    • Collections
    • Facilities to Services
    • E – Database
    • E – Journals
    • Institutional Membership
    • CBRI IR
    • Feedback & Suggestions
  • Dissemination
    • Annual Reports
    • News Letters / भवनिका / Books
    • CSIR Integrated Skill Initiative
      • Upcoming Activities
      • Past Training Activities
      • JIGYASA – Quest for Curiosity
    • Student Training & Mentoring Group
      • Vocational Training
  • Notifications
    • Tenders
    • Recruitments
    • Property Return
  • Manpower
    • Scientists
    • Technical
    • Group II & I
    • Administration
  • Technology
    • Design, fabrication and Installation of COVID-19 Hospital
    • For People
    • For Industry
Menu back  
 

Development of Fast, Durable and Energy Efficient Mass Housing Scheme

WP 5: Disaster Resiliency in Housing Project

Task 5.4: Design of fire safety and evacuation strategy for buildings

Task Leader(s): Dr. Shorab Jain

Objective:

  • Assessment of Fire Hazard and Design of Fire Safety Systems for Mass Housing.
  • Simulation of Spread of Smoke inside building
  • Developing emergency response strategies using coupled fire simulation and virtual technology for suggesting improvements in building plan

Description of Task:

There are number of fire instances, which have raised concern regarding fire safety in high rise buildings. Therefore, it becomes essential to carry out systematic design for an effective fire protection system and timely evacuation of occupants from burning buildings.

The failure of timely evacuations of occupants from burning buildings result from improper layout of building structure and unreasonable choices made by occupants due to panic or unfamiliarity with building. In current evacuation models, the evacuation behavior is predicted mathematically. However human responses and behavior are quite complex during fires and difficult to predict correctly. For accurate predictions of human behavior emergency evacuation training and drills are conducted in real buildings which has disadvantages of high cost, limited repetitiveness and inherent danger.

This research makes use of Virtual Reality Technique coupled with fire simulations to study behavior of fire inside a built environment and to assess human response for timely evacuation from the building. This will help in evaluating whether building designs are reasonable. This will do away with the need of emergency evacuation training and drills in real buildings by conducting evacuation training and drills in virtual environment overcoming the disadvantages of high cost, poor repetitiveness and inherent danger in real buildings.

Virtual reality technology in conjunction with fire simulations in buildings has not been done in the country so far for developing fire evacuation strategies in case of fire disaster.

Deliverables:

  • Design of fire safety system-detection/ suppression and prediction of spread of smoke inside building
  • Design guidelines for fire evacuation strategies in mass housing projects
Related posts
Task 5.3: Improvement in CSIR-CBRI developed pre-fab technologies
August 19, 2018
Task 5.2: Design of confined masonry construction using different types units (concrete masonry block, ACC block)
August 19, 2018
Task 5.1: Design interventions for enhancement of robustness in traditional construction
August 19, 2018
Mass Housing
  • Mass Housing Project
  • WP1 (Mass Housing Project)
    • Task 1.2: Development of Bio-based construction material for sustainable mass housing
    • Task 1.4: Development of Cold-formed Steel (CFS) wall panels with improved structural performance & fire resistance
  • WP2 (Mass Housing Project)
    • Task 2.5: Development of prefab RC shear wall systems and evaluation of their lateral load resistance
    • Task 2.6: Development of efficient mechanical anchorage device for precast beam-column joint
  • WP3 (Mass Housing Project)
    • Task 3.1: Recycling of agricultural/industrial/solid wastes for building infrastructures
    • Task 3.2: Eco-friendly corrosion inhibition to improve concrete durability
    • Task 3.3: Protective coating for improved energy efficiency in buildings
    • Task 3.4: Development of anti-termite barrier for mass housing
  • WP4 (Mass Housing Project)
    • Task 4.1: Mechanization in construction process of Pre-fabricated building components for mass housing
    • Task 4.2: Mechanization in production of prefabricated building components and wall plastering for of mass housing
  • WP5 (Mass Housing Project)
    • Task 5.1: Design interventions for enhancement of robustness in traditional construction
    • Task 5.2: Design of confined masonry construction using different types units (concrete masonry block, ACC block)
    • Task 5.3: Improvement in CSIR-CBRI developed pre-fab technologies
    • Task 5.4: Design of fire safety and evacuation strategy for buildings
  • WP6 (Mass Housing Project)
    • Task 6.1: Ground improvement technique to mitigate liquefaction hazards for safe building construction
    • Task 6.2: Ground improvement using granular pile anchor foundation (GPAF) system
    • Task 6.3: Development of modified static and seismic design methodology of piled-raft foundation
    • Task 6.4: Design and strengthening measures for building foundation systems in hilly regions
  • WP10 (Mass Housing Project)
    • Task 10.1: Formulation of guidelines for constructing mass housing including the cost analysis
    • Task 10.2: Organization of skill development programmes
    • Task 10.3: Demonstration of developed technology/know-how(s)
Important Links
  • CSIR Integrated Skill Initiative
  • JIGYASA – Quest for Curiosity
  • Internal Complaints Committee
  • Guest House
  • Medical Facilities
  • Forms
  • Web Policies
    • Terms & Conditions
    • Disclaimer
    • Copyright Policy
    • Hyperlink Policy
    • Privacy Policy
  • Sitemap
  • Contacts
Upcoming Events

There are no upcoming events.

View Calendar
Latest Updates
Walk-In Interview: Advt No: CSIR-CBRI – Estt./2020/03 new_icon

Advt No: CSIR-CBRI – Estt./2020/01  [Corrigendum]  [RESULT] new_icon

CSIR - CBRI, Roorkee
Copyright @ CSIR - Central Building Research Institute